Start with a specific operating issue.
We begin with instability, inefficient transitions, or underperforming control. The focus is to isolate where performance has drifted and identify the underlying cause.
When performance has degraded and a specific issue needs to be diagnosed and corrected, focused engineering work happens directly within your control environment, alongside your plant engineers in live operation. Scope comes from what the diagnostic found or from the scope you already have.
We begin with instability, inefficient transitions, or underperforming control. The focus is to isolate where performance has drifted and identify the underlying cause.
Diagnostics, model updates, and improvements are carried out directly within the plant's control systems, alongside plant engineers in live operation. This may include APC improvement, PID loop tuning, CLPM implementation, or developing models and soft sensors where predictive control is not in place.
Changes show up in plant performance: more stable operation, improved control response, and reduced reliance on manual intervention. Performance is measured in the unit, under real operating conditions.
In environments without advanced control, Atlas establishes baseline models, soft sensors, and control strategies to enable stable and measurable performance.
Address model drift and remove constraint barriers.
Tune specific PID loops, validated through runtime analysis.
Shorten transitions and limit the off-spec material produced.
Add a continuous reading between lab samples.
Realign models that no longer reflect how the unit runs today.
Where advanced control does not yet exist, build the foundation first.
With lab samples only, quality is confirmed three times a shift. An excursion between samples never appears, and correction happens after the product is made. With a soft sensor, the same lab samples anchor a reading available every minute. The excursion is visible as it develops and control acts on it. The soft sensor is recalibrated against each new lab result.
Quality is confirmed three times a shift.
A reading available every minute.
performance has degraded.
control is stable but not tight.
control maturity is limited.
Temperature, pressure, or reactor behavior begins to swing, leading to off-spec production, operating risk, or unstable upstream and downstream conditions.
Transitions take longer than expected, with more off-spec material and difficulty holding consistent product quality.
Controllers move in and out of manual, responses turn sluggish or unstable, and performance drifts as plant conditions change.
Critical loops oscillate, respond slowly, or sit in manual, which pushes variability into neighboring loops.
Pressure drop increases and heat transfer loses effectiveness, which requires more energy to hold conditions and limits process stability.
Plants with declining APC performance, rising manual intervention, inconsistent quality, or longer transitions than before.
When performance has degraded and a specific issue needs to be diagnosed and corrected, focused engineering work happens directly within your control environment, alongside your plant engineers in live operation. Scope comes from what the diagnostic found or from the scope you already have.